Substation Resuscitation & 32 kV Overhead Works
The current service page identifies this project under “Transnet – Electrical Cabling”.
Line equipment was supplied, installed and commissioned as part of the substation recovery works.
Insukamini’s actual project experience reorganised into a consistent record for tender evaluators, facilities teams and larger clients.
The current service page identifies this project under “Transnet – Electrical Cabling”.
Line equipment was supplied, installed and commissioned as part of the substation recovery works.
A long-duration mechanical assignment at PRASA House.
Air-conditioning systems were installed and maintained over the published 36-month project period.
Mechanical cooling work within a data-centre environment.
Down-blower cooling equipment was installed for the MTN Newlands data-centre environment.
University HVAC installation and ongoing maintenance.
Air-conditioning systems were installed and maintained throughout the published three-year period.
Hospital mechanical-plant repair work.
Chiller-plant and vacuum-pump service/repair work was delivered over the recorded two-month assignment.
A dedicated ventilation and cooling installation project.
Extractor-fan and air-conditioning equipment was installed during the published project period.
Germiston Switch, Doornfontein Switch, Cape Town Switch, Tygerberg Switch and 14th Avenue H/O; node decommissioning and biometric access control.
Installation of down blowers for the FNB Randburg data-centre environment.
Published as a Stulz Mozambique data-centre cooling project.
Published as a Stulz Angola data-centre cooling project.
Installation, maintenance and repairs of fridges and air-conditioning equipment.
Building repairs, restoration, conservation and plumbing.
Service and maintenance of kitchen equipment together with plumbing works.
Maintenance, supply and installation of new air conditioners and replacement units.