8-month project
Transnet · Christiana Substation

Substation Resuscitation & 32 kV Overhead Works

The current service page identifies this project under “Transnet – Electrical Cabling”.

ClientTransnet
Location / facilityChristiana Substation
ScopeSubstation resuscitation · 32 kV overhead · line equipment supply/install/commissioning
Duration8 months
Recorded result

Line equipment was supplied, installed and commissioned as part of the substation recovery works.

Current Insukamini website project-section imagery
36-month project
PRASA · PRASA House

Air-Conditioner Installation & Maintenance

A long-duration mechanical assignment at PRASA House.

ClientPRASA
Location / facilityPRASA House
ScopeAir-conditioner installation + maintenance
Duration36 months
Recorded result

Air-conditioning systems were installed and maintained over the published 36-month project period.

Current Insukamini website project-section imagery
Data-centre cooling
Stulz · MTN Newlands

Down-Blower Installation

Mechanical cooling work within a data-centre environment.

ClientStulz / MTN Newlands
Location / facilityMTN Newlands data centre
ScopeInstallation of down blowers
Duration4 months
Recorded result

Down-blower cooling equipment was installed for the MTN Newlands data-centre environment.

Current Insukamini website project-section imagery
36-month project
University of the Witwatersrand

Air-Conditioning Installation & Maintenance

University HVAC installation and ongoing maintenance.

ClientWits University
Location / facilityUniversity facilities
ScopeInstall + maintain air conditioners
Duration36 months
Recorded result

Air-conditioning systems were installed and maintained throughout the published three-year period.

Current Insukamini website project-section imagery
Chiller plant
Rahima Moosa Hospital

Chiller Plant & Vacuum-Pump Repairs

Hospital mechanical-plant repair work.

ClientRahima Moosa Hospital
Location / facilityHospital mechanical plant
ScopeService + repairs of chiller plant / vacuum pumps
Duration2 months
Recorded result

Chiller-plant and vacuum-pump service/repair work was delivered over the recorded two-month assignment.

Current Insukamini website project-section imagery
2-month project
Transnet

Extractor Fans & Air-Conditioning Installation

A dedicated ventilation and cooling installation project.

ClientTransnet
Location / facilityNot publicly specified
ScopeExtractor fans + air conditioners
Duration2 months
Recorded result

Extractor-fan and air-conditioning equipment was installed during the published project period.

Additional published project record

More experience, with the scope kept exactly where the source supports it.

MTN · Fibre Networks

Multi-Site Fibre Installation

Germiston Switch, Doornfontein Switch, Cape Town Switch, Tygerberg Switch and 14th Avenue H/O; node decommissioning and biometric access control.

Duration: 8 months.
Result: the listed fibre/network, node and access-control work was delivered across the named sites.
Stulz · FNB Randburg

Data-Centre Down Blowers

Installation of down blowers for the FNB Randburg data-centre environment.

Duration: 1 month.
Result: down-blower installation delivered.
Stulz · Mozambique

Data Centre Cooling

Published as a Stulz Mozambique data-centre cooling project.

Duration: 3 months.
Result: the published cooling scope was delivered.
Stulz · Angola

Data Centre Cooling

Published as a Stulz Angola data-centre cooling project.

Duration: 3 months.
Result: the published cooling scope was delivered.
NHLS

Fridges & Air Conditioners

Installation, maintenance and repairs of fridges and air-conditioning equipment.

Duration: 1 month.
Result: listed refrigeration/HVAC works delivered.
Mowana Properties · Colman Building

Repairs, Restoration & Plumbing

Building repairs, restoration, conservation and plumbing.

Duration: 12 months.
Result: the listed building-maintenance scope was delivered over the project term.
Steve Biko Hospital

Kitchen Equipment & Plumbing

Service and maintenance of kitchen equipment together with plumbing works.

Duration: 36 months.
Result: long-duration facility-maintenance support.
SAPS · Mpumalanga Regions 1 & 2

Air-Conditioning Maintenance & Replacement

Maintenance, supply and installation of new air conditioners and replacement units.

Duration: 36 months.
Result: ongoing HVAC maintenance, supply, installation and replacement work.
Accuracy note: “Result” describes only the completion or deliverable that follows directly from Insukamini’s published scope and duration. No project values, savings, capacity improvements or unsupported outcomes have been invented. Images are labelled as current-site project-section imagery rather than asserted to be documentary photographs of the named contract.